NSC P1-P3 Factory Experiment

For questions on nomming rocks and planetary interaction.
Forum rules
This forum can be viewed by the public.
Post Reply
User avatar
Ryo Soikutsu
Member
Member
Posts: 7
Joined: 2023.06.20 08:20

NSC P1-P3 Factory Experiment

Post by Ryo Soikutsu »

Code: Select all

[13:45:10] > Class-3 "Researcher" permission required to access archive
[13:45:12] > Reading permission...
[13:45:21] > Class-1 "Associate Director" permission detected, write access granted.
====== START OF ENTRY ======

=== NORTHLAND PROJECT ARCHIVE - PROJECT FACTORIO ===

Time of Entry: YC126 January 3, 1348 NEST (New Eden Standard Time)
Entry By: Associate Director - ID-ASSOC-CAL-92413
Estimated Duration: 1 - 3 months (subjected to further discretion by the Board of Directors)
Location: PC9-AY Planet 3 - Intaki Commerce Trading Post

Description:
Project "Factorio" aims to test the limits of the planet-side industrial capabilities of the "EVE University" (abbreviated E-UNI, EUNI) organization, specifically the NullSec Campus (abbreviated NSC), as well as to investigate the possibility of revenue streams through the importing, processing and exporting of Tier-1 Basic Planetary goods ("P1") to more advanced, Tier-3 Specialized Planetary goods ("P3"). Collaborations and agreements between various E-UNI capsuleer pilots have been established, and preparations for Planet Cycle 1 are underway.

Objectives/Aims:
- To test the limits of the NSC's planet-side industrial capabilities
- To experiment with a possible revenue stream for the Northland Foundation to fund future endeavors and programmes

Collaboration agreements:
As agreed during collaboration discussions, the Foundation will be purchasing all P1 products from partners at a pre-determined price. An agreement has also been established with a Jump Freighter pilot to handle logistics between the NSC and the Jita trade hub.

Further details and observations will be logged as the experiment is underway.

====== END OF ENTRY ======

Code: Select all

[14:11:26] > Entry lock requested at YC126 January 3, 1411 NEST, awaiting approval...
[14:15:52] > Entry lock approved by Class-0 "Director" [REDACTED]
[14:16:10] > Entry successfully locked and archived
User avatar
Ryo Soikutsu
Member
Member
Posts: 7
Joined: 2023.06.20 08:20

Re: NSC P1-P3 Factory Experiment

Post by Ryo Soikutsu »

===== RESERVED BY NORTHAI =====
User avatar
Ryo Soikutsu
Member
Member
Posts: 7
Joined: 2023.06.20 08:20

Re: NSC P1-P3 Factory Experiment

Post by Ryo Soikutsu »

===== RESERVED BY NORTHAI =====
User avatar
Ryo Soikutsu
Member
Member
Posts: 7
Joined: 2023.06.20 08:20

Re: NSC P1-P3 Factory Experiment

Post by Ryo Soikutsu »

===== RESERVED BY NORTHAI =====
User avatar
Ryo Soikutsu
Member
Member
Posts: 7
Joined: 2023.06.20 08:20

Re: NSC P1-P3 Factory Experiment

Post by Ryo Soikutsu »

===== RESERVED BY NORTHAI =====
Post Reply